The Details

Mechanical Contractor

Admiral Mechanical Service

Builder

PACT Construction

Construction Value

$9.7 Million

Completion Date

September 2016


Airdivision took on this challenging and complex project as one of its major installation contracts. The existing building was renovated and the roof raised to allow for a new air-conditioning system designed mainly to supply the larger auditorium. The duct installation was a critical part of the building process and included supply and return air ductwork up to 2.5 metres wide installed to 8 metres’ height above the floor level using specialist lifting equipment. Other components included a rooftop plantroom, large rooftop ductwork, extra-large outside air ductwork and silencers, new kitchen and toilet exhaust system and a vast fabric duct installation for the new cafe area. A short building schedule and limited working space meant this project required a great amount of collaboration and team work to complete.