The Details
Mechanical Contractor
Airmaster
Completion Date
April 2017
This project included the replacement of 13 package units and ductwork. Careful planning and coordination was required to complete this project in two stages within a small time frame. A specialised helicopter was used in the installation due to the technically challenging location and unavailability to crane access.